23 April 2021
Copyright
Copyright © 2020-2021 Philippine Green Building Council.
The BERDE Program was established and administered by the Philippine Green Building Council (PHILGBC). The BERDE Green Building Rating System is the product of the BERDE Program. The BERDE Green Building Rating Schemes (GBRS), BERDE User Guides (User Guide) are documents developed under the system.
This User Guide is available online for use by project teams, building owners, professionals, contractors, and other interested parties as a reference voluntary standard for the measurement of environmental performance of projects.
You may make copies of any information reasonably incidental to your viewing of the document, and may retain a copy for your personal reference. You are not allowed to sell, modify, reproduce, display or distribute the User Guide for any public or commercial purposes, except with the expressed written permission from the PHILGBC. You are not allowed to transmit, distribute or store a copy of this document in any other website or in a networked environment.
This document is protected by Republic Act No. 8293: Intellectual Property Code of the Philippines and international copyright laws. Any unlawful use of this document shall be subject to sanction and legal action of the PHILGBC.
The PHILGBC accepts no responsibility for any unauthorized use or distribution by others of this document and may take legal action to prevent such unauthorized use or distribution.
Published by the Philippine Green Building Council
Unit G-4B, One/NEO, 26th Street corner 3rd Avenue
Bonifacio Global City
Taguig City 1634 Philippines
+632 7728 0686
berde@philgbc.org
The latest release of the User Guide may be accessed through https://docs.berdeonline.org/userguide/latest.
The latest release of the Credit Library may be accessed through https://docs.berdeonline.org/creditlibrary.
Navigating the Credit Library
This Credit Library is a guidance document to support the implementation of the BERDE GBRS.
Who should use this Credit Library?
This Credit Library is developed for project owners, developers, architects, engineers, designers, and other members of BERDE-registered green building project teams.
How do you use the Credit Library?
The information in this Credit Library is presented in a clear and easily understandable manner using plain language. You may navigate through the guide by:
- Scrolling the page;
- Using the Navigation Panel; or
- Using the search box at the top-right corner of the page.
Navigation Panel
If you are viewing the Credit Library on your laptop or computer, use the Navigation Panel
at the left side of this website. The Navigation Panel
includes all major sections of the Credit Library.
As you scroll through the page, the panel displays your current location in the Credit Library. You can also select any of the section headings on the panel to jump to that section.
If you are viewing the Credit Library on your mobile phone or tablet, select Menu
at the top-left corner of the Credit Library to view the Navigation Panel
.
Search Box
The Search Box
is located above the Navigation Panel
that allows you to swiftly search through the whole Credit Library.
Type keywords related to the information you are searching for. All sections with your keywords will be displayed below the search bar for easier navigation through the guide.
Printing the Credit Library
The Credit Library is distributed online to promote the use of less paper. However, you may print the Credit Library if you need a copy of the document. Printing the Credit Library will result in the type-formatted version of the guide. Please be mindful that the guide is updated from time to time. Visit the online Credit Library regularly to ensure you have the latest version of the document.
- Open the Credit Library in your preferred browser.
- Print the Credit Library.
- For Windows,
Control + P
, or - For macOS,
Command + P
.
- For Windows,
Guidance Notes
Guidance Notes
are included to provide additional information and assist you in implementing BERDE in your project.
About BERDE
This section provides a background on the BERDE Green Building Rating System.
About BERDE Certification
This section provides information on how you can get your project BERDE Certified, which includes information on the process, the ratings, and the minimum system requirements.
About BERDE GBRS – New Construction
This section provides information on the BERDE GBRS – New Construction, eligible projects for BERDE-NC, and validity of the certification under this scheme.
Rating Scheme
This section of the Credit Library includes the categories and credits for the approved rating scheme for BERDE GBRS. To ensure consistency and clarity, each credit includes the following subsections:
- Purpose and intent,
- Requirements, which includes—
- Stage 1 — Design
- Stage 2 — Construction
- Stage 3 — Operations
- Compliance, which includes—
- Stage 1 — Design and its Performance Requirements
- Stage 2 — Construction and its Performance Requirements
- Stage 3 — Operations and its Performance Requirements
To provide further guidance in implementing the credits, the following subsections were included in the related credits:
- Terms and definitions; and
- Resources.
Requirement levels
The requirements under BERDE and in the Credit Library uses the following modals or auxiliary verbs to ensure clarity and consistency in writing and interpreting the requirements:
Provisions using: | refers to: |
---|---|
Must | absolute requirements. Must and shall are equivalent in the use of these documents. |
Must not | absolute prohibitions. Must not and shall not are equivalent in the use of these documents. |
Should | highly recommended provisions. Highly recommended provisions were identified as the most appropriate requirements for a credit. If you will not be implementing these provisions, you must have a clear explanation why it is not applicable for your project, and a reasonable alternative to address these requirements. |
Should not | discouraged provisions. These provisions are not recommended, however, it may be acceptable or valid within certain conditions. You must ensure that you have understood the full implication of these provisions before implementing these requirements. |
May | optional provisions or information. |
About BERDE
What is BERDE?
BERDE is a tool to assess, measure, monitor and certify the performance of projects above and beyond existing national and local building and environmental laws, regulations and mandatory standards.
BERDE is the National Voluntary Green Building Rating System by the Philippine government, through the Department of Energy (DOE).
BERDE is continuously developed and administered by the Philippine Green Building Council (PHILGBC) under its BERDE Program.
What is BERDE Certification?
BERDE Certification is the formal assessment, rating, and certification process for projects of the BERDE Program. It is conducted in a third-party assessment process to ensure a credible, independent, impartial, and objective assessment, rating, and certification of projects under BERDE.
Only projects that complete the formal process, complies with all requirements, and receives at least the minimum rating for certification may claim as a BERDE Certified green building project.
About Electives
What are Electives?
Electives are optional credits that aim to address wider sustainability benefits. These credits are not necessarily part of the Core Framework.
In developing Elective credits, the International Framework for Socio-Economic Factors for Green Building Rating Tools in Developing Countries (WorldGBC & GBCSA, 2013) is used as the guiding framework in identifying socio-economic priorities for green building projects.
What are the priority areas for Electives?
Based on the the International Framework for Socio-Economic Factors for Green Building Rating Tools in Developing Countries (WorldGBC & GBCSA, 2013), the socio-economic priority areas are:
- Employment and economic opportunities,
- Education and skills development,
- Health and safety,
- Equality, and
- Community engagement and benefit.
How can you apply Elective credits to your project undergoing BERDE Certification?
The project team must successfully comply with the requirements of their pursued Elective credits during the assessment process for the project.
The project team must indicate the pursued Elective credits and scores under the Electives section of the scoresheet when submitting for assessment. Only a maximum of 30 points may be awarded to projects under Electives.
The project must achieve at least a BERDE 1-Star rating to qualify for the Elective credits as additional points during the assessment of the project.
How can you recommend new Elective credits?
Project teams may recommend new Elective credits under BERDE. When developing new Elective credits, the credits must:
- Have clear sustainability impact; and
- Be objective and measurable.
Credits may be:
- Design initiatives or building attributes, or
- Design, construction or operations processes.
Credits may be addressed at different levels or spheres of influence, whether at the:
- Project level. Project-level objectives may be addressed within the project scope that have a broader socio-economic impact on the people and the community; or
- Corporate or organizational level. Organizational-level policies and programs related to the project may have positive socio-economic impact that has influence much further into the organization's behavior.
Recommend new Elective credits
To recommend a new Elective credit, the project team must:
- Download Form — New Elective Credit.
- Accomplish Form — New Elective Credit for each recommended Elective credit. Forms with incomplete fields will not be processed.
- Under Contact Information, complete your contact information to allow us to validate, clarify or confirm your recommendation for BERDE.
- Under New Elective Credit, complete the information on the recommended new credit, including the:
- Applicable GBRS;
- Purpose and Intent reflecting the sustainability impact of the credit;
- Requirement on how to achieve the Purpose and Intent;
- Compliance documentation that reflects the objective and measurable evidence how the project achieved the Requirements; and
- Compliance Requirements showing the level of performance and the equivalent point a project may achieve for the credit.
- Save the accomplished form in Portable Document Format (.pdf).
- Submit the accomplished form to the BERDE Program Secretariat at BERDE@philgbc.org.
The BERDE Program Secretariat will receive and conduct an initial review of the submission before forwarding the recommendations to the BERDE Committee.
Credit Library
The Credit Library is the collection of approved Elective credits available for the use of projects undergoing BERDE Certification.
Community engagement and benefit
EL-COM-01 Filipino Art
Pilot All Stages
Contents
Purpose and Intent
This credit aims to promote Filipino heritage and culture through art.
Requirements
Stage 1 — Design
The project team must:
- Procure artworks from local Filipino artists, which must be:
- Promoting positive Filipino values;
- Highlighting Filipino heritage and culture;
- Directly connected to the building;
- Permanently installed;
- Properly labelled; and
- Accessible and visible to users and visitors.
- Establish policies and procedures in the maintenance of the artwork.
- Establish program to promote the artwork.
Stage 2 — Construction
The project team must install the artwork.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Procure and install artworks from local Filipino artists, which must be:
- Promoting positive Filipino values;
- Highlighting Filipino heritage and culture;
- Directly connected to the building;
- Permanently installed;
- Properly labelled; and
- Accessible and visible to users and visitors.
- Establish policies and procedures in the maintenance of the artwork.
- Establish program to promote the artwork.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Concept notes of the identified artworks reflecting local Filipino heritage and culture;
- Proof of procurement of the artworks, which should include:
- Communication records between the project team and artists on the procurement of the artworks;
- Service contract or purchase order;
- Plans reflecting the—
- Location of the artworks;
- Location of the markers or labels;
- Access of the public to the artworks; and
- Installation methodology;
- Specifications reflecting installation methodology of the artworks;
- Policies and procedures for the maintenance of the artworks;
- Program for the promotion of the artworks, which should include the following information:
- Schedule for regular activities to feature the artworks and promote Filipino heritage and culture; and
- Resources allocated for the implementation of the program.
The marker or label for the artworks must include the following information:
- Name of the artwork;
- Name of the artist;
- Medium used; and
- Description of the concept.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must:
- Accomplished Template – Credit Submission;
- As-built plans reflecting the—
- Location of the artworks
- Location of the markers or labels
- Access of the public to the artworks
- Installation methodology
- Purchase and installation records of the artworks, which should include:
- Official receipts or sales invoices;
- Delivery receipts;
- Installation records; and
- Photographs.
- Policies and procedures for the maintenance of the artworks;
- Program for the promotion of the artworks.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Concept notes of the identified artworks reflecting local Filipino heritage and culture;
- Proof of procurement of the artworks, which should include:
- Communication records between the project team and artists on the procurement of the artworks;
- Service contract or purchase order;
- Plans reflecting the—
- Location of the artworks;
- Location of the markers or labels;
- Access of the public to the artworks; and
- Installation methodology;
- Specifications reflecting installation methodology of the artworks;
- Policies and procedures for the maintenance of the artworks;
- Program for the promotion of the artworks, which should include the following information:
- Schedule for regular activities to feature the artworks and promote Filipino heritage and culture; and
- Resources allocated for the implementation of the program.
The marker or label for the artworks must include the following information:
- Name of the artwork;
- Name of the artist;
- Medium used; and
- Description of the concept.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
EL-COM-02 Community Facility
Pilot All Stages
Contents
Purpose and Intent
This credit aims to provide the community with spaces for non-commercial events and functions for public and social benefit of the community.
Requirements
Stage 1 — Design
The project team must:
- Conduct a consultation with stakeholders in the community to identify activities needed facilities.
- Establish a multi-purpose facility in the project, which must be:
- For the shared use of the community;
- For activities identified in the consultations or for public or social benefit;
- Used free of charge;
- At least 0.5% of the TGFA or at least 50 m2, whichever is larger.
- Establish a program with the community and community organizations on the use of the facility.
Stage 2 — Construction
The project team must construct the multi-purpose facility.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Conduct a consultation with stakeholders in the community to identify activities needed facilities.
- Design a multi-purpose facility in the project, which must be:
- For the shared use of the community;
- For activities identified in the consultations or for public or social benefit;
- Used free of charge;
- At least 0.5% of the TGFA or at least 50 m2, whichever is larger.
- Construct the multi-purpose facility.
- Establish a program with the community and community organizations on the use of the facility.
Compliance
Stage 1 — Design
The project team must submit:
- Report on the stakeholder consultations, which must include:
- Attendance list,
- Agenda of the consultation reflecting the discussions on the use of a multi-purpose facility on activities for public or social benefit,
- Proceedings of the consultation,
- Recommendations from the stakeholders, and
- Photographs;
- Plans and specifications reflecting the following:
- Design of the multi-purpose facility;
- Location of the multi-purpose facility;
- Size of the multi-purpose facility in m2;
- Policies and procedures for the use of the multi-purpose facility; and
- Contract with the community and other community organizations on the use of the multi-purpose facility for at least five (5) years.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified products, technologies or strategies in the design of the project.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
1 point |
|
Stage 2 — Construction
The project team must submit:
- As-built plans and specifications reflecting the following:
- Location of the multi-purpose facility;
- Size of the multi-purpose facility in m2;
- Purchase and installation records, which must include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit:
- Report on the stakeholder consultations, which must include:
- Attendance list,
- Agenda of the consultation reflecting the discussions on the use of a multi-purpose facility on activities for public or social benefit,
- Proceedings of the consultation,
- Recommendations from the stakeholders, and
- Photographs;
- Plans and specifications reflecting the following:
- Design of the multi-purpose facility;
- Location of the multi-purpose facility; and
- Size of the multi-purpose facility in m2;
- Policies and procedures for the use of the multi-purpose facility; and
- Contract with the community and other community organizations on the use of the multi-purpose facility for at least five (5) years.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified products, technologies or strategies in the design of the project.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
1 point |
|
EL-COM-03 Emergency Energy During Disruptions
Pilot All Stages
Contents
Purpose and Intent
This credit aims to maintain safe conditions and provide emergency energy to satisfy critical loads of the project in the event of extended power outages.
Requirements
Stage 1 — Design
The project team must:
- Establish the target emergency energy capacity for the project.
- Identify the critical loads that will need emergency energy during power disruptions.
- Identify the appropriate emergency energy system for the project.
- Establish policies and procedures on the use of emergency energy system in the project.
The duration for the capacity of the emergency energy must be provided based on the project type and its function.
If the facility is: | Then the time duration for emergency energy must be: |
---|---|
Residential buildings, Lodging, Hospitals, Nursing homes, Emergency shelters and emergency facilities, Fire stations, Emergency call centers, Police stations, and Other emergency frontline facilities |
Four (4) consecutive days, 24 hours per day. |
Pharmacies, Convenience stores, Grocery stores and facilities with significant stocks of refrigerated or frozen foods, and automated teller machines (ATMs) in these facilities |
Four (4) consecutive days, eight (8) hours each day during daylight hours for general operations. |
Refrigeration and freezers for grocery stores and facilities with significant stocks of refrigerated or frozen goods | Four (4) consecutive days, 24 hours per day |
Gas stations | Four (4) consecutive days, 12 hours each day or until fuel stocks are exhausted primarily during daylight hours |
ATMs at banks and public facilities, such as malls and stores | Powered during regular business hours |
Stage 2 — Construction
The project team must implement the identified emergency energy for the project.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Establish the target emergency energy capacity for the project.
- Identify the critical loads that will need emergency energy during power disruptions.
- Identify the appropriate emergency energy system for the project.
- Establish policies and procedures on the use of emergency energy system in the project.
- Implement the identified emergency energy for the project.
The duration for the capacity of the emergency energy must be provided based on the project type and its function.
If the facility is: | Then the time duration for emergency energy must be: |
---|---|
Residential buildings, Lodging, Hospitals, Nursing homes, Emergency shelters and emergency facilities, Fire stations, Emergency call centers, Police stations, and Other emergency frontline facilities |
Four (4) consecutive days, 24 hours per day. |
Pharmacies, Convenience stores, Grocery stores and facilities with significant stocks of refrigerated or frozen foods, and automated teller machines (ATMs) in these facilities |
Four (4) consecutive days, eight (8) hours each day during daylight hours for general operations. |
Refrigeration and freezers for grocery stores and facilities with significant stocks of refrigerated or frozen goods | Four (4) consecutive days, 24 hours per day |
Gas stations | Four (4) consecutive days, 12 hours each day or until fuel stocks are exhausted primarily during daylight hours |
ATMs at banks and public facilities, such as malls and stores | Powered during regular business hours |
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy approved by the project owner on the target emergency energy for the project;
- List of the critical loads of the project, which should include:
- Mechanical air conditioning equipment that supplies fresh air or regulates the indoor air temperature to comfortable levels in the project;
- Water pumps for access to potable water;
- Lighting systems, which should include all building spaces and emergency exits;
- At least one (1) electrical receptacle per area or per 23 m2 of occupied space;
- Communication systems, including modems and wireless routers for internet access; and
- At least one (1) elevator for hospitals or as required by law.
- Report reflecting the calculation for the necessary emergency energy supply for critical loads for the duration of emergency energy based on project type and use;
- Plans reflecting the following information:
- Location of the critical loads, and
- Location of the emergency energy system;
- Specifications reflecting the following information:
- Energy consumption rates of the critical loads, and
- Capacity of the system reflecting at least the necessary emergency energy supply for the duration of emergency energy based on project type and use;
- Policies and procedures on the use of the emergency energy system.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified critical load systems and the emergency energy system in the design of the project.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- List of the critical loads of the project, which should include:
- Mechanical air conditioning equipment that supplies fresh air or regulates the indoor air temperature to comfortable levels in the project;
- Water pumps for access to potable water;
- Lighting systems, which should include all building spaces and emergency exits;
- At least one (1) electrical receptacle per area or per 23 m2 of occupied space;
- Communication systems, including modems and wireless routers for internet access; and
- At least one (1) elevator for hospitals or as required by law.
- As-built plans reflecting the following information:
- Location of the critical loads, and
- Location of the emergency energy system;
- As-built specifications reflecting the following information:
- Energy consumption rates of the critical loads, and
- Capacity of the system reflecting at least the necessary emergency energy supply for the duration of emergency energy based on project type and use.
- Purchase and installation records of the critical loads and emergency energy system, which should include:
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs;
- Commissioning report.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy approved by the project owner on the target emergency energy for the project;
- List of the critical loads of the project, which should include:
- Mechanical air conditioning equipment that supplies fresh air or regulates the indoor air temperature to comfortable levels in the project;
- Water pumps for access to potable water;
- Lighting systems, which should include all building spaces and emergency exits;
- At least one (1) electrical receptacle per area or per 23 m2 of occupied space;
- Communication systems, including modems and wireless routers for internet access; and
- At least one (1) elevator for hospitals or as required by law.
- Report reflecting the calculation for the necessary emergency energy supply for critical loads for the duration of emergency energy based on project type and use;
- As-built plans reflecting the following information:
- Location of the critical loads, and
- Location of the emergency energy system;
- As-built specifications reflecting the following information:
- Energy consumption rates of the critical loads, and
- Capacity of the system reflecting at least the necessary emergency energy supply for the duration of emergency energy based on project type and use;
- Policies and procedures on the use of the emergency energy system.
- Purchase and installation records of the critical loads and emergency energy system, which should include:
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs;
- Commissioning report.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
EL-COM-04 Off-site Financial Support for Habitat Protection
Pilot All Stages
Contents
Purpose and Intent
This credit aims to:
- Conserve existing off-site natural areas; and
- Restore damaged areas to provide and promote biodiversity.
Requirements
Stage 1 — Design
23 April 2021, Release 5 Under Requirements Stage 1 – Design, replaced the numbers on the sub-list with bullets for consistency in the format.
The project team must:
- Establish a policy for supporting the conservation and restoration of natural environment and biodiversity.
- Identify an environmental organization that conserves and restores natural areas and restores damaged natural areas. The environmental organization must:
- Be recognized by the Philippine government;
- Have a mandate for conservation of natural environment and biodiversity and restores damaged natural areas; and
- Has established programs for conservation and restoration of natural environment and biodiversity;
- Provide financial support for the conservation and restoration of natural environment and biodiversity.
The financial support must be equivalent to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification, which must include the building footprint.
Stage 2 — Construction
The project owner must report how the financial support was used by the environmental organization for conservation and restoration of natural environment and biodiversity.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Establish a policy for supporting the conservation and restoration of natural environment and biodiversity.
- Identify an environmental organization that conserves and restores natural areas and restores damaged natural areas. The environmental organization must:
- Be recognized by the Philippine government;
- Have a mandate for conservation of natural environment and biodiversity and restores damaged natural areas; and
- Has established programs for conservation and restoration of natural environment and biodiversity;
- Provide financial support for the conservation and restoration of natural environment and biodiversity.
- Provide report on how the financial support was used by the environmental organization for conservation and restoration of natural environment and biodiversity.
The financial support must be equivalent to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification, which must include the building footprint.
Compliance
Stage 1 — Design
The project owner must submit the following:
- Accomplished Template – Credit Submission;
- Policy reflecting the project owner’s commitment to support conservation and restoration of natural environment and biodiversity;
- Agreement between the project owner and the environmental organization, which must reflect the following:
- Purpose of the financial support for the conservation and restoration of natural areas and biodiversity; and
- Amount of the financial support amounting to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification.
- Documentation of the qualifications of the environmental organization, which must include:
- Proof that the environmental organization is a recognized by the Philippine government;
- Proof of the environmental mandate of the organization, which must include the conservation and restoration of natural environment and biodiversity; and
- Proof of existing programs of the environmental organization in delivering their environmental mandate for conservation and restoration;
- Communication records with the environmental organization for the financial support;
- Plans reflecting the total lot area of the project in m2;
- Report on the calculation for the financial support, which must reflect the following:
- Total lot area in m2; and
- Calculation of the minimum financial support based on the total lot area of the project;
- Official receipt for the financial support to the environmental organization amounting to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
2 points |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission, which must include:
- Changes in the submission for Stage 1, and
- Narrative on how the project complied with the requirements of the credit.
- Official receipt for the financial support to the environmental organization amounting to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification;
- Report on how the financial support to the environmental organization was used for conserving and restoring the natural environment and biodiversity; and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
2 points |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project owner must submit the following:
- Accomplished Template – Credit Submission;
- Policy reflecting the project owner’s commitment to support conservation and restoration of natural environment and biodiversity;
- Agreement between the project owner and the environmental organization, which must reflect the following:
- Purpose of the financial support for the conservation and restoration of natural areas and biodiversity; and
- Amount of the financial support amounting to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification.
- Documentation of the qualifications of the environmental organization, which must include:
- Proof that the environmental organization is a recognized by the Philippine government;
- Proof of the environmental mandate of the organization, which must include the conservation and restoration of natural environment and biodiversity; and
- Proof of existing programs of the environmental organization in delivering their environmental mandate for conservation and restoration;
- Communication records with the environmental organization for the financial support;
- Plans reflecting the total lot area of the project in m2;
- Report on the calculation for the financial support, which must reflect the following:
- Total lot area in m2; and
- Calculation of the minimum financial support based on the total lot area of the project;
- Official receipt for the financial support to the environmental organization amounting to at least PHP 215.00 per square meter based on the total lot area of the project undergoing BERDE Certification;
- Report on how the financial support to the environmental organization was used for conserving and restoring the natural environment and biodiversity; and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
2 points |
|
EL-COM-05 Urban Agriculture
Pilot All Stages
Contents
Purpose and Intent
This credit aims to:
- Improve health and well-being; and
- Increase community involvement and education about food production.
Requirements
Stage 1 — Design
The project team must:
- Engage a competent and qualified professional. When engaging a professional, the project owner must:
- Identify the necessary qualifications for the professional for the planning and implementing the production of vegetables and food-bearing plants native to the Philippines in the project;
- Define the roles and responsibilities of the professional; and
- Engage the professional for the duration of the design and construction of the project.
- Design permanent growing areas for vegetables and food-bearing plants and storage facilities for equipment and tools in the project accessible by the project users. The growing area must include at least three (3) different types of vegetables and food-bearing plants native to the Philippines.
- Establish a local crop production plan for the project for the continuous production and maintenance of the growing areas for food production during operations.
The size of the actual growing areas must either be: * At least five percent (5%) of the project’s vegetated area but not less than 25 m2; or * At least fifteen percent (15%) of the rooftop surface area but not less than 20 m2. Functional and usable spaces, such as helipads, recreational courts, and areas covered by equipment and solar panels are excluded from the calculations.
Stage 2 — Construction
The project team must:
- Implement the permanent growing areas for vegetables and food-bearing plants and the storage facilities for equipment and tools in the project accessible by the project users.
- Plant at least three (3) different types of vegetables and food-bearing plants native to the Philippines in the growing areas.
- Establish a local food production plan for the project for the continuous production and maintenance of the growing areas for food production during operations.
The size of the actual growing areas must either be: * At least five percent (5%) of the project’s vegetated area but not less than 25 m2; or * At least fifteen percent (15%) of the rooftop surface area but not less than 20 m2. Functional and usable spaces, such as helipads, recreational courts, and areas covered by equipment and solar panels are excluded from the calculations.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Engage a competent and qualified professional. When engaging a professional, the project owner must:
- Identify the necessary qualifications for the professional for the planning and implementing the production of vegetables and food-bearing plants native to the Philippines in the project;
- Define the roles and responsibilities of the professional; and
- Engage the professional for the duration of the design and construction of the project.
- Design and implement permanent growing areas for vegetables and food-bearing plants and storage facilities for equipment and tools in the project accessible by the project users.
- Plant at least three (3) different types of vegetables and food-bearing plants native to the Philippines in the growing areas.
- Establish a local crop production plan for the project for the continuous production and maintenance of the growing areas for food production during operations.
The size of the actual growing areas must either be: * At least five percent (5%) of the project’s vegetated area but not less than 25 m2; or * At least fifteen percent (15%) of the rooftop surface area but not less than 20 m2. Functional and usable spaces, such as helipads, recreational courts, and areas covered by equipment and solar panels are excluded from the calculations.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Proof of engagement of the professional for the project, which must include the following information:
- Qualifications of the professional in planning and implementing the production of vegetables and food bearing plants in the project
- Roles and responsibilities of the professional
- Period of engagement of the professional for the project
- Report on the calculation for the size of the permanent growing area for the project, which must include:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Minimum area of the growing areas for vegetables and food-bearing plants in m2
- Basis for the minimum growing area for the project, which must either be:
- Plans reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas for vegetables and food-bearing plants
- Storage facility for equipment and tools
- Access to the growing areas and storage for the project users
- Location of—
- Growing areas in the project
- Different types of native vegetables and food-bearing plants in the growing areas
- Storage facility
- Basis for the minimum growing area for the project, which must either be:
- Specifications reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas
- Storage facility
- Irrigation methodology
- Soil conditions
- Types of native vegetables and food-bearing plants for the project
- Basis for the minimum growing area for the project, which must either be:
- Local food production plan for the project for the continuous production and maintenance of the growing areas for food production during operations, which should include:
- Roles and responsibilities for the continuous operations and maintenance of the food production;
- Personnel requirements and qualifications for the operations and maintenance of the growing areas;
- Types of native vegetables and food-bearing plants for the project;
- Methodology in nurturing, harvesting and continuous production of the different types of vegetables and food-bearing plants for the project; and
- Communication plan for local food production to the project team, external contractors, suppliers and users of the project during operations.
The project team should submit purchase orders as proof for the intent to purchase the identified products, technologies and strategies in the design of the local food production for the project.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- As-built plans reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas for vegetables and food-bearing plants
- Storage facility for equipment and tools
- Access to the growing areas for the project users
- Location of—
- Growing areas in the project
- Different types of native vegetables and food-bearing plants in the growing areas
- Storage facility for equipment and tools
- Basis for the minimum growing area for the project, which must either be:
- As-built specifications reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas
- Storage facility
- Irrigation methodology
- Soil conditions
- Different types of native vegetables and food-bearing plants for the project
- Basis for the minimum growing area for the project, which must either be:
- Local food production plan for the project for the continuous production and maintenance of the growing areas for food production during operations, which should include:
- Personnel requirements and qualifications for the maintenance and operations of the growing areas;
- Different types of native vegetables and food-bearing plants for the project;
- Methodology in nurturing, harvesting and continuous production of the different types of vegetables and food-bearing plants for the project; and
- Communication plan for local food production to the project team, external contractors, suppliers and users of the project during operations.
- Documentation of the procurement and implementation of the growing areas and the plants, which must include the following:
- Purchase records, which must include the following—
- Purchase orders
- Service contracts
- Official receipts and sales invoices
- Delivery receipts;
- Installation records; and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Proof of engagement of the professional for the project, which must include the following information:
- Qualifications of the professional in planning and implementing the production of vegetables and food bearing plants in the project
- Roles and responsibilities of the professional
- Period of engagement of the professional for the project
- Report on the calculation for the size of the permanent growing area for the project, which must include:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Minimum area of the growing areas for vegetables and food-bearing plants in m2
- Basis for the minimum growing area for the project, which must either be:
- As-built plans reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas for vegetables and food-bearing plants
- Storage facility for equipment and tools
- Access to the growing areas and storage for the project users
- Location of—
- Growing areas in the project
- Different types of native vegetables and food-bearing plants in the growing areas
- Storage facility
- Basis for the minimum growing area for the project, which must either be:
- As-built specifications reflecting the following information:
- Basis for the minimum growing area for the project, which must either be:
- Total lot area in m2; or
- Total usable roof surface in m2;
- Total area in m2 of the—
- Growing areas
- Storage facility
- Irrigation methodology
- Soil conditions
- Types of native vegetables and food-bearing plants for the project
- Basis for the minimum growing area for the project, which must either be:
- Local food production plan for the project for the continuous production and maintenance of the growing areas for food production during operations, which should include:
- Roles and responsibilities for the continuous operations and maintenance of the food production;
- Personnel requirements and qualifications for the operations and maintenance of the growing areas;
- Types of native vegetables and food-bearing plants for the project;
- Methodology in nurturing, harvesting and continuous production of the different types of vegetables and food-bearing plants for the project; and
- Communication plan for local food production to the project team, external contractors, suppliers and users of the project during operations.
- Purchase records, which must include the following—
- Purchase orders
- Service contracts
- Official receipts and sales invoices
- Delivery receipts;
- Installation records; and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Employment and economic opportunity
EL-ECO-01 Local Labor
Pilot NC
Contents
Purpose and Intent
This credit aims to encourage employment creation and stimulation of the local economy.
Requirements
Stage 1 – Design
The project owner must:
- Establish a policy for hiring local labor for the project.
- Communicate the policy for hiring local labor to the project team.
- Compute the projected number of construction workers and staff for the project.
Stage 2 — Construction
The project team must hire local labor residing within 250 km radius from the project site.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 – Operations
The project owner must:
- Establish a policy for hiring local labor for the project.
- Communicate the policy for hiring local labor to the project team.
- Compute the projected number of construction workers and staff for the project.
- Hire local labor residing within 250 km radius from the project site.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy reflecting the—
- Commitment of the project owner in hiring local labor
- Target percentage of local labor based on the total number of workers and staff
- Communication records reflecting requirement for hiring local labor to project team, external contractors and service providers; and
- Report reflecting the number of projected construction workers and staff for the project.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- List of all construction workers and staff employed for the project, which must include the following information—
- Employee's name
- Employee's address
- Distance of the address from the project site
- Proof of residency of each construction worker and staff, which must:
- Be a valid government-issued certification or ID;
- Reflect the employee's name; and
- Reflect the complete address of the employee.
- Report reflecting the percentage of construction workers and staff residing within 250 km from the project site.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy reflecting the—
- Commitment of the project owner in hiring local labor
- Target percentage of local labor based on the total number of workers and staff
- Communication records reflecting requirement for hiring local labor to project team, external contractors and service providers;
- List of all construction workers and staff employed for the project, which must include the following information—
- Employee's name
- Employee's address
- Distance of the address from the project site
- Proof of residency of each construction worker and staff, which must:
- Be a valid government-issued certification or ID;
- Reflect the employee's name; and
- Reflect the complete address of the employee.
- Report reflecting the percentage of construction workers and staff residing within 250 km from the project site.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Education and skills development
EL-EDU-01 Staff Training
Pilot NC OP
Contents
Purpose and Intent
This credit aims to increase the education and skills development of supervisory, technical and professional employees for the project.
Requirements
The project owner must establish a policy in providing trainings for employees for the project.
The project team must provide training for at least twenty-five percent (25%) of all the employees for the project. Trainings provided should be on the following:
- Sustainability features, benefits and impacts, and actual implementation in the design, construction and operations of projects;
- Local heritage and nationalism; and
- Gender diversity and sensitivity.
Compliance
The project team must submit the following:
- Accomplished Template – Credit Submission;
- List of all employees for the project, which must include the following information—
- Employee's name
- Employee's designation or position in the project
- Trainings attended
- Number of hours trained
- Training report for each training conducted reflecting the following information—
- Training name
- Training objective
- Training date, time and program
- Instructors' names and qualifications
- Attendance list
- Photographs
- Training modules; and
- Report reflecting the computation of the percentage of employees that successfully completed trainings.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
EL-EDU-02 Green Building Features Promotion
Pilot NC OP
Contents
Purpose and Intent
This credit aims to educate the building users on green building strategies and solutions featured in the project.
Requirements
Stage 1 — Design
The project team must:
- Establish a program for the promotion of all of the green building features of the project. The program must:
- Actively inform users about all of the green building features of the project and their sustainability benefits; and
- Be for a duration of at least a five (5) years.
- Prepare a case study on the design of the project, which should include:
- All of the green building features of the project;
- Positive environmental, economic and social impact of the green building features of the project; and
- Successes and lessons learned during the design of the project as an example for other projects.
The project owner must provide consent on the publication and use of the case study for educational purposes to the PHILGBC.
Stage 2 — Construction
The project team must:
- Install or construct the information facilities identified in the program.
- Prepare a case study on the construction of the project, which should include:
- All of the green building features of the project;
- Positive environmental, economic and social impact of the green building features of the project; and
- Successes and lessons learned during the construction of the project as an example for other projects.
The project owner must provide consent on the publication and use of the case study for educational purposes to the PHILGBC.
Stage 3 — Operations
- Establish a program for the promotion of all of the green building features of the project. The program must:
- Actively inform users about all of the green building features of the project and their sustainability benefits; and
- Be at least a five-year program.
- Implement the promotion program.
- Prepare a case study on the operations of the project, which should include:
- All of the green building features of the project;
- Positive environmental, economic and social impact of the green building features of the project; and
- Successes and lessons learned during the operations of the project as an example for other projects.
The project owner must provide consent on the publication and use of the case study for educational purposes to the PHILGBC.
Compliance
Stage 1 — Design
The project team must submit the following:
- Plans reflecting the following:
- Location of all of the green building strategies in the project,
- Access routes of the users to view the green building strategies,
- Location of the information facilities, which may include:
- Kiosks
- Bulletins
- Markers
- Signage
- Specifications of the information facilities;
- Program for the promotion of all of the green building features, which should include the following information:
- Schedule for regular activities to feature the green building strategies in the project; and
- Resources allocated for the implementation of the program, including personnel requirements and budget;
- Case study on the design of the project.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified products, technologies or strategies in the design of the project.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point | Plans and specifications reflecting the access of the users to the green building features and information facilities. |
Stage 2 — Construction
The project team must submit the following:
- As-built plans reflecting the following:
- Location of all of the green building strategies in the project,
- Access routes of the users to view the green building strategies, and
- Location of the information facilities, which may include:
- Kiosks
- Bulletins
- Markers
- Signage
- As-built specifications of the information facilities;
- Purchase and installation records, which should include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs;
- Program for the promotion of all of the green building features, which should include the following information:
- Schedule for regular activities to feature the green building strategies in the project; and
- Resources allocated for the implementation of the program, including personnel requirements and budget;
- Case study on the construction of the project.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 3 — Operations
The project team must submit the following:
- As-built plans reflecting the following:
- Location of all of the featured green building strategies in the project,
- Access routes of the users to view the green building strategies, and
- Location of the information facilities, which may include:
- Kiosks
- Bulletins
- Markers
- Signage
- As-built specifications of the information facilities;
- Program for the promotion of all of the green building features, which should include the following information:
- Schedule for regular activities to feature the green building strategies in the project; and
- Resources allocated for the implementation of the program, including personnel requirements and budget;
- Report reflecting the implementation of the regular activities for the promotion of the green building features, which must include:
- Attendance list,
- Proceedings of the activity, and
- Photographs.
- Case study on the operations of the project.
If products or services were procured for the operations of the project, the project team must submit:
- Plans and specifications of the procured products, technologies or equipment;
- Purchase records, which should include the following—
- Purchase orders
- Service contracts
- Official receipts or sales invoices
- Delivery receipts
- Installation records; and
- Photographs.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point | As-built plans and specifications reflecting the access of the users to the green building features and information facilities. |
Equality
EL-EQU-01 Women Empowerment
Pilot NC OP
Contents
Purpose and Intent
This credit aims to reward initiatives that improve access to the employment market for women in the design, construction and operations phases of green building projects.
Requirements
Stage 1 — Design
The project owner must:
- Establish a policy for gender equality.
- Establish a procedures to operationalize the policy, which should include the following:
- Establishing the target impact or performance for the project;
- Establishing strategies to increase the employment of women in the design and construction of the project;
- Communicating the requirements for employment to the project team; and
- Monitoring and recording the implementation of the policy and procedures.
The project team must:
- Communicate the policies and procedures to the project stakeholders.
- Assign the roles and responsibilities in the implementation of the policies and procedures to the project stakeholders.
- Employ women in the design of the project.
Stage 2 — Construction
The project team must:
- Communicate the policies and procedures to the project stakeholders.
- Assign the roles and responsibilities in the implementation of the policies and procedures to the project stakeholders.
- Employ women in the construction of the project.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Design
The project owner must:
- Establish a policy for gender equality.
- Establish a procedures to operationalize the policy, which should include the following:
- Establishing the target impact or performance for the project;
- Establishing strategies to increase the employment of women in the design and construction of the project;
- Communicating the requirements for employment to the project team; and
- Monitoring and recording the implementation of the policy and procedures.
- Communicate the policies and procedures to the project stakeholders.
- Assign the roles and responsibilities in the implementation of the policies and procedures to the project stakeholders.
- Employ women in the design of the project.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy on gender equality, which should include:
- Requirements for employment of women in the design and construction of the project;
- Target performance for the project;
- Procedures on the following:
- Establishing the target impact or performance for the project;
- Establishing strategies to increase the employment of women in the design and construction of the project;
- Communicating the requirements for employment to the project team; and
- Monitoring and recording the implementation of the policy and procedures.
- Communication records with the project team, external contractors and service providers reflecting the requirement for employment;
- List of all employees in the design of the project, which should include the following information—
- Name
- Gender
- Company
- Designation
- Role and responsibilities in the design of the project
- E-mail address
- Phone numbers
- Report reflecting the computation on the percentage of women employed based on the number of all employees in the design of the project.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Communication records with the project team, external contractors and service providers reflecting the requirements for employment;
- List of all employees in the construction of the project, which should include the following information—
- Name
- Gender
- Company
- Designation
- Role and responsibilities in the design of the project
- E-mail address
- Phone numbers
- Report reflecting the computation on the percentage of women employed based on the number of all employees in the design of the project.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Policy on gender equality, which should include:
- Requirements for employment of women in the design and construction of the project;
- Target performance for the project;
- Procedures on the following:
- Establishing the target impact or performance for the project;
- Establishing strategies to increase the employment of women in the design and construction of the project;
- Communicating the requirements for employment to the project team; and
- Monitoring and recording the implementation of the policy and procedures.
- Communication records with the project team, external contractors and service providers reflecting the requirement for employment;
- List of all employees in the design of the project, which should include the following information—
- Name
- Gender
- Company
- Designation
- Role and responsibilities in the design of the project
- E-mail address
- Phone numbers
- Report reflecting the computation on the percentage of women employed based on the number of all employees in the design of the project.
Performance Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Health and safety
EL-HEA-01 Occupational Health and Safety Improvement
Pilot S1 S2
Contents
Purpose and Intent
This credit aims to improve occupational health and safety across the project life-cycle through early attention to safety and health hazards.
Requirements
Stage 1 – Design
The project team must:
- Review the potential risks and hazards for the project's life-cycle, which should include:
- An inventory of risks and hazards in the:
- Construction of the project
- Operations and maintenance of the project
- The recommended design strategies to eliminate or reduce the risks and hazards for the construction and operations of the project;
- An inventory of risks and hazards in the:
- Incorporate the recommendations to eliminate or reduce construction, operations and maintenance risks and hazards in the design of the project.
- Establish an occupational safety and health program, which must include the following:
- Identifying the target impact for improving the OSH, which may include—
- No disabling injuries or illnesses
- No or low incidence of non-disabling injuries or illnesses
- Improved coverage for health services
- Increased expenditures on health awareness and disease risk control programs
- Establishing medical surveillance, prevention and control, with particular focus on:
- Early detection and management of occupational and work-related diseases; and
- Prevention and control of:
- Human immunodeficiency virus and acquired immune deficiency syndrome (HIV/AIDS) compliant with Republic Act No. 9165,
- Tuberculosis compliant with Executive Order No. 187-03, and
- Hepatitis B compliant with DOLE Department Advisory 05-2010.
- Communicating and promoting safety and health to project stakeholders, including:
- Orienting all workers on occupational safety and health, which must include:
- Healthy lifestyle,
- Drug-free workplace compliant with Republic Act No. 9165, and
- Mental health compliant with Republic Act No. 11036;
- Continuous training OSH personnel on OSH;
- Training and educating workers on the policies and procedures for safe workplace, including:
- Processing work permit systems,
- Using personal protective equipment (PPE),
- Providing safety signage;
- Orienting all workers on occupational safety and health, which must include:
- Providing workers' welfare facilities and PPE;
- Establishing and implementing policies and procedures for construction activity pollution control, including dust control and management;
- Establishing and implementing a solid waste management system;
- Establishing roles and responsibilities for the implementation of the plan, which must include:
- Establishing an OSH Committee for planning and supervising the OSH program; and
- Engaging OSH personnel for the project;
- Monitoring and reporting the implementation of the program, which must include:
- Investigating, recording and reporting accidents, incidents or illnesses; and
- Establishing and implementing policies and procedures for penalties for violations and prohibited acts;
- Identifying the costs and establishing budget for the implementation of the OSH program.
- Identifying the target impact for improving the OSH, which may include—
- Communicate the policies and procedures to the project stakeholders.
OSH personnel for a project must include:
- Certified first-aider recognized by the Department of Labor and Employment (DOLE), and
- Safety officers.
In addition, if the project is required under a regulation, the OSH personnel for a project must also include:
- Occupational health nurse,
- Occupational health dentist, and
- Occupational health physician.
Stage 2 — Construction
The project team must:
- Engage qualified and competent OSH personnel for the project. The project team must:
- Identify the necessary qualifications for each of the OSH personnel;
- Define the roles and responsibilities of each OSH personnel; and
- Engage the OSH personnel for the duration of the construction of the project.
- Implement the design strategies to eliminate or reduce the risks and hazards for the construction, operations and maintenance of the project.
- Implement the OSH program, which must include:
- Communicating the OSH program to the project stakeholders regularly; and
- Monitoring and recording the implementation of the OSH program.
- Monitor and report all disabling and non-disabling injuries or illnesses in the project.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Review the potential risks and hazards for the project's life-cycle, which should include:
- An inventory of risks and hazards in the operations and maintenance of the project
- The recommended strategies to eliminate or reduce the risks and hazards for the operations of the project;
- Incorporate the recommendations to eliminate or reduce operations and maintenance risks and hazards in the project.
- Establish an occupational safety and health program, which must include the following:
- Identifying the target impact for improving the OSH, which may include—
- No disabling injuries or illnesses
- No or low incidence of non-disabling injuries or illnesses
- Improved coverage for health services
- Increased expenditures on health awareness and disease risk control programs
- Establishing medical surveillance, prevention and control, with particular focus on:
- Early detection and management of occupational and work-related diseases; and
- Prevention and control of:
- Human immunodeficiency virus and acquired immune deficiency syndrome (HIV/AIDS) compliant with Republic Act No. 9165,
- Tuberculosis compliant with Executive Order No. 187-03, and
- Hepatitis B compliant with DOLE Department Advisory 05-2010.
- Communicating and promoting safety and health to project stakeholders, including:
- Orienting all workers on occupational safety and health, which must include:
- Healthy lifestyle,
- Drug-free workplace compliant with Republic Act No. 9165, and
- Mental health compliant with Republic Act No. 11036;
- Continuous training OSH personnel on OSH;
- Training and educating workers on the policies and procedures for safe workplace, including:
- Processing work permit systems,
- Using personal protective equipment (PPE),
- Providing safety signage;
- Orienting all workers on occupational safety and health, which must include:
- Providing workers' welfare facilities and PPE;
- Establishing and implementing policies and procedures for pollution control;
- Establishing and implementing a solid waste management system;
- Establishing roles and responsibilities for the implementation of the plan, which must include:
- Establishing an OSH Committee for planning and supervising the OSH program; and
- Engaging OSH personnel for the project;
- Monitoring and reporting the implementation of the program, which must include:
- Investigating, recording and reporting accidents, incidents or illnesses; and
- Establishing and implementing policies and procedures for penalties for violations and prohibited acts;
- Identifying the costs and establishing budget for the implementation of the OSH program.
- Identifying the target impact for improving the OSH, which may include—
- Communicate the policies and procedures to the project stakeholders.
- Engage qualified and competent OSH personnel for the project. The project team must:
- Identify the necessary qualifications for each of the OSH personnel;
- Define the roles and responsibilities of each OSH personnel; and
- Engage the OSH personnel for the operations of the project.
- Implement the strategies to eliminate or reduce the risks and hazards for the operations and maintenance of the project.
- Implement the OSH program, which must include:
- Communicating the OSH program to the project stakeholders regularly; and
- Monitoring and recording the implementation of the OSH program.
- Monitor and report all disabling and non-disabling injuries or illnesses in the project.
OSH personnel for a project must include:
- Certified first-aider recognized by the Department of Labor and Employment (DOLE), and
- Safety officers.
In addition, if the project is required under a regulation, the OSH personnel for a project must also include:
- Occupational health nurse,
- Occupational health dentist, and
- Occupational health physician.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Report on the review of risks and hazards in the construction, operation and maintenance of the project, which must include:
- Risks and hazards identified related to:
- Construction
- Operations and maintenance
- Description of the recommended design strategies to eliminate or reduce identified risks and hazards; and
- Description on how the design strategies will eliminate or reduce the identified risk or hazards during construction, operations and maintenance;
- Risks and hazards identified related to:
- Plans and specifications reflecting how the recommendations were incorporated in the design of the project;
- Occupational safety and health program, which must include the policies, procedures and work instructions on:
- Identifying the target impact for improving the OSH, which may include—
- No disabling injuries or illnesses
- No or low incidence of non-disabling injuries or illnesses
- Improved coverage for health services
- Increased expenditures on health awareness and disease risk control programs
- Establishing medical surveillance, prevention and control, with particular focus on:
- Early detection and management of occupational and work-related diseases; and
- Prevention and control of:
- Human immunodeficiency virus and acquired immune deficiency syndrome (HIV/AIDS) compliant with Republic Act No. 9165,
- Tuberculosis compliant with Executive Order No. 187-03, and
- Hepatitis B compliant with DOLE Department Advisory 05-2010.
- Providing workers' welfare facilities and PPE;
- Construction activity pollution control, including dust control and management;
- Solid waste management system;
- Monitoring and reporting the implementation of the program, which must include:
- Investigating, recording and reporting accidents, incidents or illnesses; and
- Establishing and implementing policies and procedures for penalties for violations and prohibited acts;
- Identifying the target impact for improving the OSH, which may include—
- Report on the costs and budget for the implementation of the OSH program;
- Organizational chart reflecting the roles and responsibilities for the implementation of the plan, which must include:
- OSH Committee for planning and supervising the OSH program; and
- OSH personnel for the project;
- Communication plan and records on safety and health to project stakeholders, which must include:
- Agenda for activities for the promotion of OSH to workers;
- Communication materials for OSH to project stakeholders;
- Plans and specifications for safety signage, which must reflect:
- Location of the signage
- Details reflected in the signage
- Communication records reflecting all project stakeholders are effectively informed of the OSH program.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified products, technologies or strategies in the design of the project.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point | Report on the review of the hazards and risks for the project life-cycle and design recommendations to eliminate or reduce the hazards and risks. |
Stage 2 — Construction
The project team must:
- Accomplished Template – Credit Submission;
- List of OSH personnel for the project, which must include the following information—
- Name
- Company
- Designation
- Role for the project
- E-mail address
- Phone numbers
- Proof of engagement for each of the OSH personnel, which must include the following information—
- Qualifications of each of the OSH personnel
- Roles and responsibilities for the project
- Period of engagement of each of the OSH personnel in the project
- As-built plans and specifications reflecting the strategies implemented to reduce the risks and hazards for the construction, operations and maintenance of the project;
- Purchase and installation records, which must include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
- Communication records to all project team members, external contractors, service providers and employees, reflecting the following information—
- Requirements, policies and procedures for OSH
- Schedules and dates when the information was regularly distributed to project stakeholders
- Monitoring report on the implementation of the OSH program, which must include:
- Reports on all disabling and non-disabling injuries or illnesses for the duration of the construction of the project reflecting the following:
- Disabling injuries frequency rate
- Disabling illnesses frequency rate
- Reports on all disabling and non-disabling injuries or illnesses for the duration of the construction of the project reflecting the following:
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
23 April 2021, Release 5 Added compliance requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Accomplished Template – Credit Submission;
- Report on the review of risks and hazards in the operation and maintenance of the project, which must include:
- Risks and hazards identified related to operations and maintenance;
- Description of the recommended strategies to eliminate or reduce identified risks and hazards; and
- Description on how the strategies will eliminate or reduce the identified risk or hazards during operations and maintenance;
- Occupational safety and health program, which must include the policies, procedures and work instructions on:
- Identifying the target impact for improving the OSH, which may include—
- No disabling injuries or illnesses
- No or low incidence of non-disabling injuries or illnesses
- Improved coverage for health services
- Increased expenditures on health awareness and disease risk control programs
- Establishing medical surveillance, prevention and control, with particular focus on:
- Early detection and management of occupational and work-related diseases; and
- Prevention and control of:
- Human immunodeficiency virus and acquired immune deficiency syndrome (HIV/AIDS) compliant with Republic Act No. 9165,
- Tuberculosis compliant with Executive Order No. 187-03, and
- Hepatitis B compliant with DOLE Department Advisory 05-2010.
- Providing workers' welfare facilities and PPE;
- Pollution control;
- Solid waste management system;
- Monitoring and reporting the implementation of the program, which must include:
- Investigating, recording and reporting accidents, incidents or illnesses; and
- Establishing and implementing policies and procedures for penalties for violations and prohibited acts;
- Identifying the target impact for improving the OSH, which may include—
- List of OSH personnel for the project, which must include the following information—
- Name
- Company
- Designation
- Role for the project
- E-mail address
- Phone numbers
- Proof of engagement for each of the OSH personnel, which must include the following information—
- Qualifications of each of the OSH personnel
- Roles and responsibilities for the project
- Period of engagement of each of the OSH personnel in the project
- As-built plans and specifications reflecting the strategies implemented to reduce the risks and hazards for the construction, operations and maintenance of the project;
- Purchase and installation records, which must include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
- Communication records to all project team members, external contractors, service providers and employees, reflecting the following information—
- Requirements, policies and procedures for OSH
- Schedules and dates when the information was regularly distributed to project stakeholders
- Monitoring report on the implementation of the OSH program, which must include:
- Reports on all disabling and non-disabling injuries or illnesses for the duration of the construction of the project reflecting the following:
- Disabling injuries frequency rate
- Disabling illnesses frequency rate
- Reports on all disabling and non-disabling injuries or illnesses for the duration of the construction of the project reflecting the following:
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit. In addition, the project may be awarded with the equivalent points for this credit based on the level of compliance with the performance requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
EL-HEA-02 Active Design
Pilot All Stages
Contents
Purpose and Intent
This credit aims to improve the health of users by removing barriers and promoting physical activity in the design of the project.
Requirements
Stage 1 — Design
The project team must:
- Identify active design strategies in the project that will encourage physical activity. The active design strategies must:
- Be integrated in the design of the project;
- Influence the behavior of users and encourage physical activity;
- Be permanently installed;
- Be easily accessible to users and visitors;
- Establish public facilities to support the active design strategies identified, which may include:
- Covered walkways and courtyards
- Outdoor or indoor fitness areas and equipment
- Showers, changing rooms and lockers
- Drinking water stations or fountains
- Establish a program to encourage physically active lifestyle to the users. The program must:
- Actively inform users about the active design features of the project, their benefits and the positive impact of physically active lifestyles; and
- Be for a duration of at least a five (5) years.
Stage 2 — Construction
The project team must construct the identified strategies that encourage physical activity.
23 April 2021, Release 5 Added requirements for Stage 3 – Operations.
Stage 3 — Operations
The project team must:
- Identify active design strategies in the project that will encourage physical activity. The active design strategies must:
- Be integrated in the project;
- Influence the behavior of users and encourage physical activity;
- Be permanently installed;
- Be easily accessible to users and visitors;
- Establish public facilities to support the active strategies identified, which may include:
- Covered walkways and courtyards
- Outdoor or indoor fitness areas and equipment
- Showers, changing rooms and lockers
- Drinking water stations or fountains
- Establish a program to encourage physically active lifestyle to the users. The program must:
- Actively inform users about the active features of the project, their benefits and the positive impact of physically active lifestyles; and
- Be for a duration of at least a five (5) years;
- Construct the identified strategies that encourage physical activity.
Compliance
Stage 1 — Design
The project team must submit:
- Report reflecting the following:
- Active design strategies;
- Description how the active design strategy is integral to the use of the project, and how it will influence the behavior of users;
- Plans reflecting the following:
- Location of the—
- Active design strategies
- Public support facilities
- Access of users to the—
- Active design strategies
- Public support facilities
- Location of the—
- Specifications reflecting the technical description of the following:
- Active design strategies
- Public support facilities
- Program for the promotion of physical activity, which should include the following information:
- Schedule for regular activities for promoting the active design features of the project, and encouraging physically active lifestyle to the users; and
- Resources allocated for the implementation of the program, including personnel requirements and budget.
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified products, technologies or strategies in the design of the project.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must submit:
- As-built plans reflecting the following:
- Location of the—
- Active design strategies
- Public support facilities
- Access of users to the—
- Active design strategies
- Public support facilities
- Location of the—
- As-built specifications reflecting the technical description of the following:
- Active design strategies
- Public support facilities
- Purchase and installation records, which must include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
- Program for the promotion of physical activity, which should include the following information:
- Schedule for regular activities for promoting the active design features of the project, and encouraging physically active lifestyle to the users; and
- Resources allocated for the implementation of the program, including personnel requirements and budget.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 3 — Operations
The project team must submit:
- Report reflecting the following:
- Active design strategies;
- Description how the active design strategy is integral to the use of the project, and how it will influence the behavior of users;
- As-built plans reflecting the following:
- Location of the—
- Active design strategies
- Public support facilities
- Access of users to the—
- Active design strategies
- Public support facilities
- Location of the—
- As-built specifications reflecting the technical description of the following:
- Active design strategies
- Public support facilities
- Purchase and installation records, which must include:
- Purchase orders,
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
- Program for the promotion of physical activity, which should include the following information:
- Schedule for regular activities for promoting the active design features of the project, and encouraging physically active lifestyle to the users; and
- Resources allocated for the implementation of the program, including personnel requirements and budget.
Specification Requirements
The project may be awarded with the equivalent points for this credit based on the level of compliance with the specification requirements in the following table.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
EL-HEA-03 Pedestrian Comfort — Wind
Pilot S1 S2
Contents
Purpose and Intent
This credit aims to reduce the negative wind effects that are harmful and dangerous to pedestrians.
Requirements
Stage 1 — Design
The project team must:
- Identify the potential hazards of wind effects to pedestrians based on the design of the project.
- Identify the appropriate wind speed for street level outdoor pedestrian zones of the project.
- Design the project to maintain the appropriate wind speeds for street level outdoor pedestrian zones.
Stage 2 — Construction
The project owner must:
- Implement the design to maintain the appropriate wind speeds for street level outdoor pedestrian zones.
- Test the conditions of the outdoor pedestrian zones at street level for wind speeds.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Base case report on the wind condition of the site and the design of the project reflecting the following:
- Potential hazards from the wind to pedestrians;
- Methodology used to determine the wind speed in the site and the design of the project;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the base case condition of the site and the design of the project reflecting potential unsafe wind velocity for pedestrians;
- Report reflecting the appropriate wind speed for outdoor pedestrian zones at the street level, which should include:
- Wind speed requirement based on:
- Lawson Wind Comfort Criteria; or
- Generally accepted standards.
- Copy of the standard on wind speed requirements used for the project;
- Wind speed requirement based on:
- Plans and specifications reflecting the following:
- Outdoor pedestrian zones at the street level;
- Design strategies included in the project to maintain the appropriate wind speed for outdoor pedestrian spaces at street level; and
- Wind speed requirement for the outdoor pedestrian spaces;
- Design case report on the wind condition of the project reflecting the following:
- Methodology used to determine the wind speed in the design of the project, which must be the same methodology used for the base case;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the design case condition of the project reflecting improvement from the base case condition and safe wind velocities for pedestrians;
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified strategy to maintain appropriate wind speeds in the design of the project.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- As-built plans and specifications reflecting the following:
- Outdoor pedestrian zones at the street level;
- Design strategies included in the project to maintain the appropriate wind speed for outdoor pedestrian spaces at street level; and
- Wind speed requirement for the outdoor pedestrian spaces;
- Revised design case report on the wind condition of the project based on the implemented strategies reflecting the following:
- Methodology used to determine the wind speed in the design of the project, which must be the same methodology used for the base case;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the design case condition of the project reflecting improvement from the base case condition and safe wind velocities for pedestrians;
- Report on the testing of the wind speed for the outdoor pedestrian zones at street level of the project;
- Purchase and installation records of the strategies to maintain appropriate wind speed, which should include:
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
EL-HEA-04 Pedestrian Comfort — UV Index
Pilot S1 S2
Contents
Purpose and Intent
This credit aims to reduce the negative impact of the exposure to UV radiation in outdoor spaces in the project.
Requirements
Stage 1 — Design
The project team must:
- Identify the base case for the potential hazards of UV radiation to pedestrians in the site and the open spaces of the project.
- Establish the appropriate strategies to reduce the exposure of pedestrians to UV radiation in outdoor open spaces of the project.
The project must achieve UV Index 2 or lower for its outdoor open spaces.
Stage 2 — Construction
The project owner must:
- Implement the design to maintain the appropriate wind speeds for street level outdoor pedestrian zones.
- Measure the UV Index of the outdoor open spaces of the project.
The project must achieve UV Index 2 or lower for its outdoor spaces.
Compliance
Stage 1 — Design
The project team must submit the following:
- Accomplished Template – Credit Submission;
- Base case report on the UV Index of the site and the open spaces of the project reflecting the following:
- Methodology used to determine the UV Index in the site and the open spaces of the project;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the base case condition of the site and the design of the project reflecting exposure to high UV Index (UV Index 3 or higher);
- Plans and specifications reflecting the following information:
- Total area of the outdoor open spaces in m2,
- Location of the outdoor open spaces,
- Location of the strategies to reduce UV exposure
- Details of the strategies to reduce UV exposure
- Design case report on the UV Index of the site and the open spaces of the project reflecting the following:
- Methodology used to determine the UV Index in the site and the open spaces of the project, which must be the same methodology used for the base case;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the design case condition of the project reflecting the improvement of the UV exposure compared to the base case (UV Index 2 or lower).
In addition, the project team should submit purchase orders as proof for the intent to purchase the identified strategies to maintain the UV Index in the design of the project.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
Stage 2 — Construction
The project team must submit the following:
- Accomplished Template – Credit Submission;
- As-built plans and specifications reflecting the following information:
- Total area of the outdoor open spaces in m2,
- Location of the outdoor open spaces,
- Location of the strategies to reduce UV exposure
- Details of the strategies to reduce UV exposure
- Revised design case report on the UV Index of the site and the open spaces of the project based on the implemented strategies reflecting the following:
- Methodology used to determine the UV Index in the site and the open spaces of the project, which must be the same methodology used for the base case;
- Reference data used in the modelling or calculation; and
- Outcome of the modelling or calculation of the design case condition of the project reflecting the improvement of the UV exposure compared to the base case (UV Index 2 or lower).
- Report on the testing of the UV Index in the open spaces of the project;
- Purchase and installation records of the strategies to reduce UV exposure, which should include:
- Official receipts or sales invoices,
- Delivery receipts,
- Installation records, and
- Photographs.
Specification Requirements
The project team must show compliance with the requirements to qualify for the credit, and be awarded with the following points.
The project may be awarded: | if the project team submits the following: |
---|---|
3 points |
|
2 points |
|
1 point |
|
EL-HEA-05 Restorative Space
Pilot All Stages Offices
Content
Purpose and Intent
This credit aims aims to:
- Provide opportunities and spaces to relieve mental fatigue and stress.
- Encourage a healthy work-life balance through opportunities within and outside the workplace for recovery and restoration from work.
Requirements
Stage 1 — Design
The project team must:
- Establish a policy for restorative opportunities within and outside the workplace. The policy must include:
- Designated period for breaks throughout the workday;
- Encouraging taking breaks away from the workspace; and
- Access to areas for restoration.
- Design a dedicated space for relaxation and restoration, which must:
- Be dedicated for relaxation and restoration, and must not be used for work;
- Have a total space of at least a minimum of 7 m2 with an additional 0.1 m2 per regular project user. The space may be broken into smaller spaces of the total required space;
- Be accessible and flexible to fit a range of user preferences and activities;
- Be comfortable in terms of lighting, noise, temperature and visuals;
- Incorporate nature; and
- Be maintained at least weekly.
- Establish a program to promote activities for relaxation and restoration. The project team should:
- Establish policies and procedures on the use of the space for relaxation and restoration;
- Establish in-person or virtual activities for relaxation and restoration. The activities should include:
- Long-term trainings offered for at least twice a year;
- Weekly classes offered during a convenient time based on average employee schedules, such as lunch breaks or after work; or
- Unlimited access to at least one virtual programs.
Stage 2 — Construction
The project owner must construct the dedicated spaces for relaxation and restoration.
Stage 3 — Operations
- Establish a policy for restorative opportunities within and outside the workplace. The policy must include:
- Designated period for breaks throughout the workday;
- Encouraging taking breaks away from the workspace; and
- Access to areas for restoration.
- Establish a plan for relaxation and restoration in the project. The plan must include:
- Designing or allocating a dedicated space for relaxation and restoration, which must:
- Be dedicated for relaxation and restoration, and must not be used for work;
- Have a total space of at least a minimum of 7 m2 with an additional 0.5 m2 per regular project user. The space may be broken into smaller spaces of the total required space;
- Be accessible and flexible to fit a range of user preferences and activities;
- Be comfortable in terms of lighting, noise, temperature and visuals;
- Incorporate nature; and
- Be maintained at least weekly.
- Establishing a program to promote activities for relaxation and restoration. The project team should:
- Establish policies and procedures on the use of the space for relaxation and restoration;
- Establish in-person or virtual activities for relaxation and restoration. The activities should include:
- Long-term trainings offered for at least twice a year;
- Weekly classes offered during a convenient time based on average employee schedules, such as lunch breaks or after work; or
- Unlimited access to at least one virtual programs.
- Designing or allocating a dedicated space for relaxation and restoration, which must:
- Implement the action plan for restorative opportunities. The implementation of the plan must include:
- Assigning the roles who will be responsible for the implementation of the program;
- Constructing or allocating a dedicated space for relaxation and restoration;
- Regularly communicating with the project users and employees on the following:
- Schedules and procedures to access activities for relaxation and restoration;
- Policies and procedures on the use of the restorative spaces; and
- Available activities and resources for relaxation and restoration.
- Monitoring and recording the implementation of the program.
- Evaluate the effectivity of the program. The evaluation must include:
- Reviewing if the program was successfully implemented;
- Presenting the challenges encountered and the corrective actions implemented in the planning and implementation of the relaxation and restoration program; and
- Identifying actions to improve the program.
Score Distribution
The project team must demonstrate conformity with all the requirements of this credit. The project may be awarded with the equivalent score based on the project team's level of conformity with the credit.
Stage 1 – Design
The project may be awarded: | if the project team demonstrates: |
---|---|
3 points | Design for the restorative spaces in the project and the establishment of the program for relaxation and restoration. |
2 points | Design for the restorative spaces in the project. |
Stage 2 – Construction
The project may be awarded: | if the project team demonstrates: |
---|---|
3 points | Construction of the restorative spaces in the project and the establishment of the program for relaxation and restoration. |
2 points | Construction of the restorative spaces in the project. |
Stage 3 – Operations
The project may be awarded: | if the project team demonstrates: |
---|---|
3 points | Implementation of the restorative spaces in the project and the program for relaxation and restoration. |
2 point | Implementation of the restorative spaces in the project. |
Compliance Notes
Stage 1 — Design
The project team must submit the following:
- Policy of the project owner reflecting their commitment to design and construct restorative spaces, and promote relaxation and restoration in the project.
- Plans and specifications reflecting the following:
- Location and size of the restorative spaces in the project;
- Wayfinding and signage for the restorative spaces; and
- Design of the restorative spaces that addresses the comfort of users in terms of lighting, noise, temperature and visuals, and incorporation of nature.
- Documented program and action plan on how the project will promote the use of the restorative spaces and promote relaxation and restoration in the project, which must reflect the following information:
- Policies and procedures for the use of the restorative spaces;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of activities for relaxation and restoration.
Stage 2 — Construction
The project team must submit the following:
- As-built plans and specifications reflecting the following:
- Location and size of the restorative spaces in the project;
- Wayfinding and signage for the restorative spaces; and
- Design of the restorative spaces that addresses the comfort of users in terms of lighting, noise, temperature and visuals, and incorporation of nature.
- Proof of procurement and construction of the restorative spaces, which should include:
- Purchase records,
- Delivery receipts,
- Installation records, and
- Photographs.
- Documented program and action plan on how the project will promote the use of the restorative spaces and promote relaxation and restoration in the project, which must reflect the following information:
- Policies and procedures for the use of the restorative spaces;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of activities for relaxation and restoration.
Stage 3 — Operations
The project team must submit the following:
- Policy of the project owner reflecting their commitment to design and construct restorative spaces, and promote relaxation and restoration in the project.
- As-built plans and specifications reflecting the following:
- Location and size of the restorative spaces in the project;
- Wayfinding and signage for the restorative spaces; and
- Design of the restorative spaces that addresses the comfort of users in terms of lighting, noise, temperature and visuals, and incorporation of nature.
- Proof of implementation of the restorative spaces, which should include:
- Purchase records,
- Delivery receipts,
- Installation records, and
- Photographs.
- Documented program and action plan on how the project will promote the use of the restorative spaces and promote relaxation and restoration in the project, which must reflect the following information:
- Policies and procedures for the use of the restorative spaces;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of activities for relaxation and restoration.
- Proof for the implementation of the program and promotion of relaxation and restoration to the project users, which must include the following:
- Communication records;
- Wayfindings and signage;
- Activity reports, including proceedings, attendance lists or user lists and photographs; and
- Monitoring report on the maintenance of the restorative spaces.
- Evaluation report on the implementation of the plan, which must reflect the following:
- Challenges encountered and observed during planning and implementing the restorative spaces and the relaxation and restoration program;
- Actions taken to address the issues encountered and observed during planning and implementing the restorative spaces and the relaxation and restoration program; and
- Actions to improve the plan.
EL-HEA-06 Fruits and Vegetables Market
Pilot All Stages
Content
Purpose and Intent
This credit aims to:
- Provide access to fresh, local and seasonal fruits and vegetables to project users.
- Promote the health and lifestyle benefits of purchasing and eating fresh, local and seasonal food.
- Monitor and evaluate the effectivity of the access to fresh, local and seasonal food to project users.
Requirements
Stage 1 — Design
The project team must:
- Establish a policy reflecting the commitment of the project owner to provide a space designated solely for selling fresh, local and seasonal fruits and vegetables to the project users for a duration of at least five (5) years.
- Establish a plan to provide access to fresh, local and seasonal fruits and vegetables to the project users. The plan must include:
- Designing a space within the project site that must be:
- Dedicated space for the fruit and vegetable market;
- Exclusively feature fresh, local and seasonal fruits and vegetables; and
- Accessible to all project users;
- Supplying fresh, local and seasonal fruits and vegetables for at least once (1) a week for at least five (5) per year;
- Identifying suppliers and community-based agriculture programs for the source of fresh, local and seasonal fruits and vegetables;
- Establishing a program to promote the access to fresh, local and seasonal fruits and vegetables in the project to the project users.
- Designing a space within the project site that must be:
Stage 2 — Construction
The project team must implement the plan to provide access to fresh, local and seasonal fruits and vegetables in the project.
The implementation of the plan must include:
- Assigning the roles who will be responsible for the implementation of the plan;
- Constructing the dedicated space for the fruits and vegetable market;
- Coordinating with and confirming the supply from the local food markets and community-based agriculture programs to provide access to fresh, local and seasonal fruits and vegetables to the project users; and
- Monitoring and recording the implementation of the plan.
Stage 3 — Operations
The project team must:
- Establish a policy reflecting the commitment of the project owner to provide access to fresh, local and seasonal fruits and vegetables to the project users for at least three (3) years.
- Establish a plan to provide access to fresh, local and seasonal fruits and vegetables to the project users. The plan must include:
- Designing or designating a space within the project site that must be:
- Dedicated for the fruits and vegetables market;
- Exclusively feature fresh, local and seasonal fruits and vegetables; and
- Accessible to all project users;
- Identifying suppliers and community-based agriculture programs for the source of fresh, local and seasonal fruits and vegetables; and
- Supplying fresh, local and seasonal fruits and vegetables for at least once (1) a week for at least five (5) per year;
- Establishing a program to promote the access to fresh, local and seasonal fruits and vegetables in the project to the project users.
- Designing or designating a space within the project site that must be:
- Implement the plan to provide access to local, fresh and seasonal fruits and vegetables. The implementation of the plan must include:
- Assigning the roles who will be responsible for the implementation of the plan;
- Coordinating with and confirming supply from the suppliers and community-based agriculture programs to provide access to fresh, local and seasonal fruits and vegetables to the project users;
- Regularly communicating to the users and the project team on:
- Location within the project of the fruits and vegetables market; and
- Benefits of local, fresh and seasonal fruits and vegetables to the project users;
- Monitoring and recording the implementation of the plan.
- Evaluate the effectivity of the plan. The evaluation must include:
- Reviewing if the plan was successfully implemented;
- Presenting the challenges encountered and the corrective actions implemented in planning and implementing the plan to provide access to local, fresh and seasonal fruits and vegetables; and
- Identifying actions to improve the plan.
Score Distribution
The project team must demonstrate conformity with all the requirements of this credit. The project may be awarded with the equivalent score based on the project team's level of conformity with the credit.
All Stages
The project may be awarded: | if the project team demonstrates: |
---|---|
3 points | Establishment and implementation of the fruits and vegetables market within the project site with supply for fresh, local and seasonal fruits and vegetables, and the promotion of the access to the market to the project users. |
Compliance
Stage 1 — Design
The project team must submit the following:
- Policy of the project owner reflecting their commitment to provide access to fresh, local and seasonal fruits and vegetables in the project for a duration of at least five (5) years.
- Plans and specifications reflecting the following:
- Location and size of the fruits and vegetables market within the project site; and
- Wayfinding and signage for the fruits and vegetables market.
- Communication records and proof for coordination for the supply of fresh, local and seasonal fruits and vegetables in the project. The proof must reflect the following information:
- Name of suppliers for the fruits and vegetables;
- Contact information of the suppliers;
- Proof of the type of business and their capability to supply fresh, local and seasonal fruits and vegetables to the project.
- Documented program and action plan on how the project will promote the access to fresh, local and seasonal fruits and vegetables to the project users, which must reflect the following information:
- Policies and procedures for the promotion of the access to fresh, local and seasonal fruits and vegetables;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of the action plan during the project's operations.
Stage 2 — Construction
The project team must submit the following:
- As-built plans and specifications for the implementation of the fruits and vegetables market. The documentation must consist of the following:
- Location and size of the fruits and vegetables market within the project site; and
- Wayfinding and signage for the fruits and vegetables market.
- Proof of procurement and construction of the fruits and vegetables market, which should include:
- Purchase records,
- Delivery receipts,
- Installation records, and
- Photographs.
- Proof for the supply of fruits and vegetables in the project, such as supply contracts and agreements. The proof for the supply must reflect the following information:
- Name of suppliers for the fruits and vegetables;
- Contact information of the suppliers;
- Proof of the type of business and their capability to supply fresh, local and seasonal fruits and vegetables to the project; and
- Duration for the supply for at least five (5) years.
- Documented program and action plan on how the project will promote the access to fresh, local and seasonal fruits and vegetables to the project users.
- Policies and procedures for the promotion of the access to fresh, local and seasonal fruits and vegetables;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of the action plan during the project's operations.
Stage 3 — Operations
The project team must submit the following:
- Policy of the project owner reflecting their commitment to provide access to fresh, local and seasonal fruits and vegetables in the project for a duration of at least five (5) years.
- As-built plans and specifications reflecting the following:
- Location and size of the fruits and vegetables market within the project site; and
- Wayfinding and signage for the fruits and vegetables market.
- Proof of implementation of the fruits and vegetables market, such as:
- Monitoring reports, and
- Photographs.
- Communication records and proof for supply for the fresh, local and seasonal fruits and vegetables in the project. The proof must reflect the following information:
- Name of suppliers for the fruits and vegetables;
- Contact information of the suppliers;
- Proof of the type of business and their capability to supply fresh, local and seasonal fruits and vegetables to the project; and
- Duration of the supply for at least three (3) years.
- Documented program and action plan on how the project will promote the access to fresh, local and seasonal fruits and vegetables to the project users, which must reflect the following information:
- Policies and procedures for the promotion of the access to fresh, local and seasonal fruits and vegetables;
- Roles and responsibilities in the implementation of the action plan; and
- Schedules and duration of the implementation of the action plan during the project's operations.
- Proof for the implementation of the program and promotion of the access to fresh, local and seasonal fruits and vegetables to the project users, which must include the following:
- Communication records;
- Wayfindings and signage;
- Evaluation report on the implementation of the plan, which must reflect the following:
- Challenges encountered and observed during planning and implementing the market and the promotions program;
- Actions taken to address the issues encountered and observed during planning and implementing the market and the promotions program; and
- Actions to improve the plan.
Changes to this document
Release 5.0, 23 April 2021
Section | Change | Type |
---|---|---|
EL-COM-01 Filipino Art | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-COM-02 Community Facility | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-COM-03 Emergency Energy | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-COM-04 Off-site Financial Support for Habitat Protection | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-COM-05 Urban Agriculture | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-ECO-01 Local Labor | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-EQU-01 Women Empowerment | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-HEA-01 Occupational Health and Safety Improvement | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-HEA-02 Active Design | Added requirements and compliance requirements for Stage 3 – Operations. | Substantial |
EL-HEA-05 Restorative Space | Added new pilot credit | Substantial |
EL-HEA-06 Fruits and Vegetables Market | Added new pilot credit | Substantial |
Release 4.0, 30 July 2020
Section | Change |
---|---|
EL-COM-04 Off-site Financial Support for Habitat Protection | Added new pilot credit |
EL-COM-05 Urban Agriculture | Added new pilot credit |
Release 3.0, 14 May 2020
Section | Change |
---|---|
EL-COM-03 Emergency Energy | Added new pilot credit |
EL-HEA-03 Pedestrian Comfort – Wind | Added new pilot credit |
EL-HEA-04 Pedestrian Comfort – UV Index | Added new pilot credit |
Release 2.0, 10 February 2020
Section | Change |
---|---|
EL-COM-02 Community Facility | Added new pilot credit |
EL-EDU-02 Green Building Features Promotion | Added new pilot credit |
EL-HEA-01 Occupational safety and health improvement | Added new pilot credit |
EL-HEA-02 Active Design | Added new pilot credit |
Release 1.0, 18 November 2019
Section | Change |
---|---|
EL-COM-01 Filipino Art | Added new pilot credit |
EL-ECO-01 Local Labor | Added new pilot credit |
EL-EDU-01 Staff Training | Added new pilot credit |
EL-EQU-01 Women Empowerment | Added new pilot credit |